学年

教科

質問の種類

化学 大学生・専門学校生・社会人

固体電解質のイオン伝導度に関する質問です。 Na-β"アルミナを実験で使用しています。β"-アルミナ内のNa+移動がどのくらいの速度で行われているのかが知りたいという状況で、イオン伝導度のデータはあるのですが、単位が(Ω・cm)^(-1)のようなもので、どう扱えば単位時間... 続きを読む

PROPERTIES OF ionotec BETA"-ALUMINAS Property Phase content, % beta" Porosity,% Maximum pore size (um) Maximum grain size (um) Bending strength (MPa) Strength Weibull factor Fracture toughness (MPa m³) Ionic conductivity (ohm cm)-¹ 25°C 200°C 300°C 400°C Thermal expansion coefficient 0-500°C (x 10-6) 500-1000°C Part Number A1 A2 H1 B1 B2 C2 14 Berkeley Court Manor Park Runc orn For further details please contact: lonotec Ltd Cheshire WA7 1TQ England Na-beta" 90-95 1-2 5 20 70 105 140 100 220 220 250-300 8-13 2-3 0.002 0.092 0.24 0.38 7.2 8.6 ionotec manufactures a range of tubular shapes of standard dimensions given below. Flat discs and rectangular plates can be manufactured in any size in the range 10-70 mm across and 0.5-3.0 mm thickness. Ag-, Pb-, Sr- and Ba-conductive versions are also available. K-beta" 85-90 2-3 8 20 250-300 8-13 0.0005 0.021 0.053 0.10 7.45 8.5 Length Internal Minimum Maximum (mm) diameter thickness thickness (mm) (mm) (mm) 6.5 0.5 1.5 13 0.5 1.5 20 1 28 1 29 1 52 2 2 2 2 2 Telephone: +44(0)-1928-579668 Fax: +44(0)-1928-579627 e-mail: info@ionotec.com Web: www.ionotec.com

回答募集中 回答数: 0
化学 大学生・専門学校生・社会人

固体電解質のイオン伝導度に関する質問です。 Na-β"アルミナを実験で使用しています。β"-アルミナ内のNa+移動がどのくらいの速度で行われているのかが知りたいという状況で、イオン伝導度のデータはあるのですが、単位が(Ω・cm)^(-1)のようなもので、どう扱えば単位時間... 続きを読む

PROPERTIES OF ionotec BETA"-ALUMINAS Property Phase content, % beta" Porosity,% Maximum pore size (um) Maximum grain size (um) Bending strength (MPa) Strength Weibull factor Fracture toughness (MPa m³) Ionic conductivity (ohm cm)-¹ 25°C 200°C 300°C 400°C Thermal expansion coefficient 0-500°C (x 10-6) 500-1000°C Part Number A1 A2 H1 B1 B2 C2 14 Berkeley Court Manor Park Runc orn For further details please contact: lonotec Ltd Cheshire WA7 1TQ England Na-beta" 90-95 1-2 5 20 70 105 140 100 220 220 250-300 8-13 2-3 0.002 0.092 0.24 0.38 7.2 8.6 ionotec manufactures a range of tubular shapes of standard dimensions given below. Flat discs and rectangular plates can be manufactured in any size in the range 10-70 mm across and 0.5-3.0 mm thickness. Ag-, Pb-, Sr- and Ba-conductive versions are also available. K-beta" 85-90 2-3 8 20 250-300 8-13 0.0005 0.021 0.053 0.10 7.45 8.5 Length Internal Minimum Maximum (mm) diameter thickness thickness (mm) (mm) (mm) 6.5 0.5 1.5 13 0.5 1.5 20 1 28 1 29 1 52 2 2 2 2 2 Telephone: +44(0)-1928-579668 Fax: +44(0)-1928-579627 e-mail: info@ionotec.com Web: www.ionotec.com

回答募集中 回答数: 0
TOEIC・英語 大学生・専門学校生・社会人

この文章の和訳を誰かしていただけないでしょうか😢 英語が苦手で、、、。よろしくお願いします!

19,20 Friday, Feb. 26, 2021 O French safety officials the 写真提供:ロイターアフ。 safety official 安全局合。 on Thursday gave green light to extend the lifetime of the FESSENHEI/ 35 eDF country's oldest nuclear power plants as it seeks to boost the share of renewable 再生可能エネ ルギー mix. renewables in its power の Nuclear energy currently provides nearly 70 10 French electricity, more than in OFrance, hoping to reduce that share to 50 percent by 2035 percent of any other country. obs91 910a8 ーa target pushed back from an earlier 2025 date the help of renewables, has been holding off from building with hold off 控える、見合わ せる new reactors. 15 The French nuclear safety authority(ASN) said the country's 32 plants with 900 megawatt capacity, built mostly in the 1980s, would be allowed to operate for another nuclear safety authority 原子力安全局 decade, taking their potential lifespan to 50 initially planned 40. 20 6 They will therefore not be decommissioned before the late years from the uohee) 活導大 2020s or even late 2030s, depending on their initial launch date. 6 The safety of French nuclear plants is checked every bse 01nla8 decade. s の ASN asked state-controlled electricity provider EDF, which EDF フランス電力 the country's nuclear plants, to undertake work to safeguard the stations' security. “The main target was to limit the consequences of accident, especially any serious accident involving the manages any necessary any meltdown of a reactor," ASN's deputy director-general Julien

回答募集中 回答数: 0
TOEIC・英語 大学生・専門学校生・社会人

解答をお願いします。

rom the information we obtained, we believe First Bank and Union Bank will (D) Judgment most Iikely merge to form the biggest bank in the country. (B) Judge (A) Judging (C) Judged Tou should bring your own laptop computer, since all the computers in the office out of order. (D) being (A) is (B) are (C) been to Rome to start her own business. (D) movement 13. Janet spent 10 years in Paris before (A) move (B) moves (C) moving the spreadsheet software. (C) are updated 14.I received an e-mail from SmartSoft and (A) updating (B) update (D) updated tA 15. Mr. Carlton is seeking a position as a bond analyst on Wall Street. (C) challenged (A) challenge (B) challenging (D) to challenge 16. in 1909, the Nara Hotel has been popular with celebrities from around the world (A) Establishes (B) Establishing (C) Established (D) Having establishe 17. Before you apply for the position, you need to have the application form supervisor. (A) signed .by your (B) sign (C) been signed (D) are signing A 18. Please to the attached file when you prepare the documents for the presentation. (A) refers (B) refer (C) referred (D) referringnie 19. her extensive knowledge of computer programming, Ms. Harris is the top candidate for the position. (A) Give (B) Giving (C) Having given 20. Mr. Peterson, the department manager, insisted that all employees (D) Given time. their work on (A) finish (B) has finished (C) finishingbnoo (D) finished

解決済み 回答数: 1